parte central de la estructura de puente C-252 entre Verges y Ultramort

BAC participates in the rehabilitation of the Bridge of Verges

BAC will carry out the quality control of the bridge rehabilitation works located between the municipalities of Ultramort and Verges on the road C-252

Infraestructures.cat has awarded BAC the “Service Contract for technical assistance for quality control of extraordinary conservation works. Bridges and structures. Rehabilitation of the C-252 road bridge over the Ter river, from PK 10 + 700 to 11 + 300. Section: Ultramort – Verges. Code: CG-12058 “.

The bridge has its origins in the early 20th century, but only the south ramp and the pillars remain from the original work. The rest is a much more recent work, from the late second half of the 20th century. It is 400 m long and is made up of a double structure: the central part (214 m), supported on eight pillars, separated by 30 m from each other, and the ramps at the ends, supported on nine arches of about 6 m wide each. The bridge is made of concrete, although the south ramp has lowered arches and is externally lined with stone bound with mortar.

Compartir: