1_Puente-Rande

BAC faces the final phase of inspection and quality control of the metal structure of the Rande Bridge expansion

BAC faces the final phase of inspection and quality control of the metal structure in the Rande Bridge extension work on the AP9 over the Vigo Estuary. In addition to the enlargement project, the validity of the bridge structure and its adaptation to current regulations have been analyzed. The work Read more…