Pre-investment study at the profile level for the construction of the Pucallpa binational highway (Peru) Cruzeiro do Sul (Brazil). Section: Pucallpa – Brasil border.
Technical assistance for the design of the general improvement constructive project. New road New Interpolar Route from the connection with the C-1413a road to the (PK 8+000)- Can Sant Joan Sector. Section: Sant Cugat del Vallès.
Control and works supervision: Autovía de Lleida – Huesca. CN-240 from Tarragona to San Sebastián, p.k. 100.0 to 104.7. Section: Lleida – La Cerdera.
Control and works supervision:: N-420 road from Córdoba to Tarragona by Cuenca. Section: Falset stretch.
Construction project. Highway A-34. PK 1,143,700 to 1,151.00. Section: Cambrils – Variant of Vilaseca
Construction Design and Site Supervision of Bus VAO Lane in C-58 Highway. Stretch: Ripollet to Barcelona
Studies and designs for multiple projects: roads, buildings and urban planning (Contract for multiple projects II)
Studies and designs for multiple projects: roads, buildings and urban planning (Contract for multiple projects I)
Feasibility and enviromental study for the “Tarragona second ring road, A-7 motorway, Section: La Canonja”